Sign In | Join Free | My splicd.com
splicd.com
Shenzhen TYPMAR Wind Energy Technology Co.,Ltd
Shenzhen TYPMAR Wind Energy Technology Co.,Ltd 15 Years ! Integrated Intelligence,Dynamic Future
Home > The Tower Foundation >

CXF-300W Maglev Wind Turbine Generator Off grid System Tower Foundation

Shenzhen TYPMAR Wind Energy Technology Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Shenzhen TYPMAR Wind Energy Technology Co.,Ltd
City: Shenzhen
Province/State: Guangdong
Country/Region: China
Tel: 86-755-33872751-868
Contact Person:
Mr Tommy Huang

CXF-300W Maglev Wind Turbine Generator Off grid System Tower Foundation

Brand Name : TYPMAR
Model Number : CXF-300W
Certification : CE,ISO,IEC
Place of Origin : China
MOQ : 1 unit
Payment Terms : L/C, T/T, Western Union, MoneyGram
Supply Ability : 1000 unit per month
Delivery Time : 7 working days
Packaging Details : Plywood
Material : Steel & Cement
Safety : High
Contact Now

CXF-300W Maglev Wind Turbine Generator Off grid System Tower Foundation


1, Foundation Guide for CXF-300W

Before construction the foundation for the CXF-300W system, read these instructions carefully. These instructions are only intend to be guide for concrete foundation on solid soils or suitable roof infrastructure. Please contact your local civil or structure engineer for more information.


2, Ground Foundation

The foundation should be prepared as 1cubic meter in dimension (1000m/mX1000m/mX1000m/m) depth, dug into the soil. Please follow the diagram, make a template of the mast bottom. This template will be temporarily used for holding four Anchor Bolts vertically and electric conduit (if applied) in the precise position while pouring concrete into the foundation hole later.

Insert rebar into the foundation hole and jack up to approximately the right height. Prepare the electrical conduit in place before pouring the concrete if a hidden wiring method is applied. Attach the M16 screwed rods with nuts provided to the template. Make sure there have at least 100mm of thread above the concrete level. Fix the conduit through the center of the template and push the end of other of conduit to the side of foundation (If applied).

Add the concrete, using a vibration poker to remove air voids from the pour. It is very important to make sure that the all four rods are hooked under the rebar. Once the concrete is all poured, make sure that the template has no air voids directly underneath. More importantly, make sure the template is leveled off.

Next, clear excess concrete from above template and use a suitable cover to prevent the foundation from rain. Wait until the concrete has set complete before removing the template (It will take at least for one week).

Just remember, a solid with perfect leveled foundation is one of the key factors to achieve the success of installation.


Please refer to the Figure 3-3 for CXF-300W foundation construction.

Figure 3-3 Ground Foundation Construction Reference



Dimension Chart

A

1 meter

 

B

1 meter

 

C

1 meter

 

T-1

30mm

Concrete

T-2

400mm

Concrete

T-3

400mm

Concrete

S-1

100mm

 

S-2

200mm

 



List of Material

1

1 Cubic meter of concrete-35 Newton or better

2

4-M16 with length of 360m/m galvanized Anchor Bolts. One end is bent into a hook shape.

3

4-M16 Nuts

4

4 Galvanized washers

5

Electrical conduit, 100m/m diameter pipe or similar, maybe needed for underground wiring, if applied.



Product Tags:

construction of wind turbine

      

build wind generator

      
China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

CXF-300W Maglev Wind Turbine Generator Off grid System Tower Foundation Images

Inquiry Cart 0
Send your message to this supplier
 
From:
Enter your email please.
To: Shenzhen TYPMAR Wind Energy Technology Co.,Ltd
Subject:
Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0