Sign In | Join Free | My splicd.com
splicd.com
Shenzhen TYPMAR Wind Energy Technology Co.,Ltd
Shenzhen TYPMAR Wind Energy Technology Co.,Ltd 15 Years ! Integrated Intelligence,Dynamic Future
Home > The Tower Foundation >

600W wind turbine The Tower Foundation , triangle roof installation

Shenzhen TYPMAR Wind Energy Technology Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Shenzhen TYPMAR Wind Energy Technology Co.,Ltd
City: Shenzhen
Province/State: Guangdong
Country/Region: China
Tel: 86-755-33872751-868
Contact Person:
Mr Tommy Huang

600W wind turbine The Tower Foundation , triangle roof installation

Brand Name : TYPMAR
Model Number : CXF-300W
Certification : CE,ISO,IEC
Place of Origin : China
MOQ : 1 unit
Payment Terms : L/C, T/T, Western Union, MoneyGram
Supply Ability : 200 unit per month
Delivery Time : 7 working days
Packaging Details : Plywood
Material : Steel & Cement
Safety : High
Contact Now

600W wind turbine The Tower Foundation , triangle roof installation



I, Foundation Guide for CXF-600W


Before construction the foundation for the CXF-600W system, read these instructions carefully. These instructions are only intend to be guide for concrete foundation on solid soils or suitable roof infrastructure. Please contact your local civil or structure engineer for more information.


1. Pole's positioning (built roof)
2. Box of batteries group
3. Installation of ground wire, foundation cage
4. Pour concrete (40% ~ 50%)
5. Install battery lead hose
6. Pour concrete (100%)
7. Install the battery
8. Assemble the turbine
9. Tower parts assembly (connect turbne, solar panels, and others)
10. Lifting
11. Debugging ( tower, solar panels.)
12. Install the controller
13. Clean up the site

II, Ground Foundation
Lightning angle iron end inserts in the bottom of the Earth, can only achieve conductive effect. Fastening the cage wire terminals of the Foundation. Place ground cage, require vertical laying, foundations should be two or three centimeters below ground level at the top of the cage, parallel to the road, its center point location and road edge distances according to the drawing requirements and consistent (usually set distance of 50~60 cm)
1. Grounding electrodes into the underground, insert at the bottom of the well mud 40 ~ 50 cm
2. Lead fastening connection terminal and the foundation of cage

Add the concrete, using a vibration poker to remove air voids from the pour. It is very important to make sure that the all four rods are hooked under the rebar. Once the concrete is all poured, make sure that the template has no air voids directly underneath. More importantly, make sure the template is leveled off.

Next, clear excess concrete from above template and use a suitable cover to prevent the foundation from rain. Wait until the concrete has set complete before removing the template (It will take at least for one week). Just remember, a solid with perfect leveled foundation is one of the key factors to achieve the success of installation.



Product Tags:

Wind Turbine Tower Foundation

      

construction of wind turbine

      
China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

600W wind turbine The Tower Foundation , triangle roof installation Images

Inquiry Cart 0
Send your message to this supplier
 
From:
Enter your email please.
To: Shenzhen TYPMAR Wind Energy Technology Co.,Ltd
Subject:
Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0